The development of Granby Gardens, Wiltshire, consisted of 181 units to be completed within a 2.5-year period. The challenge of this project came from having to meet a rigid deadline, with construction already delayed due to an extremely wet and stormy start to the year. The pressure was on to try and meet the tight time scale and complete the first phase of durable construction platforms within the necessary timeframe.

Foreman Homes approached STS Access Systems, looking for an easy install decking as a time-saving method for providing safety at height for their team when accessing particular sites. STS advised that Sayfa Group™'s RhinoDeck™ safety decking system would be the ideal solution to replace the current birdcage scaffold system.
RhinoDeck™ provides a safe, quick and effective means of safety at height access thanks to its freestanding and tool less design. The safety deck can be rapidly assembled with two workers on average able to erect 50m2 per hour. As an alternative to birdcage scaffolding, the RhinoDeck™ system provided immense time savings on both the installation and removal of the working platform. This saving aided the successful delivery of the overall UK build.
The benefit of the safety platform was well received by the Foreman Homes team. The Senior QS, Will Rose saying "RhinoDeck brings both speed and flexibility to the project. I can't imagine housebuilding without it".
If you would like to learn more about the time-saving and flexible RhinoDeck™ safety deck system, then contact us today using the links below.
Email: enquiries@sayfagroup.co.uk
Phone: +44 1509 509 273
Comments