Efficient Work At Height - Sylvan Court

Updated: Feb 5

Sylvan Court, a new sheltered housing scheme, is being built by one of the south's leading construction and development business, Drew Smith Group. The new development is part of a wider Cold East Hospital regeneration project.

A durable construction platform displaying an efficient work at height solution provided by RhinoDeck™.

This construction is located in a leafy area and is being affected by extremely wet weather which has slowed down the building program. To meet the deadline of the building program, they were in urgent need of finding an efficient work at height solution.


Richard Couchman, site manager, was swayed by the RhinoDeck™ safety deck when it arrived on site. After recognising the system benefits and professionalism from Vision Access and the RhinoDeck™ team, he decided to give RhinoDeck™ easy install decking a try.


"Having experienced RhinoDeck at first hand, using anything else would be a backward step"
Richard Couchman, site manager, Drew Smith

The UK safety deck construction platforms provided workers with amazement at how efficient and durable RhinoDeck™ was. Covering the same area mass, inexperienced workers can deck out in just 2.5 days, compared to their original method on the tube and board access system which takes 10 days to fit out with the tube and board and another 3 days to remove.


With six footprints of the same size to deck out time over time, it would be expected that the switch to a temporary working platform such as RhinoDeck™, would result in a reduction of labour hours. Saving days or even weeks of labour time depending on the building programme and weather.


If you would like to learn more about the time-saving and flexible RhinoDeck™ safety decking, then contact the team today.